Strip Outs

Strip out is the demolition of internal components within a structure or building such as bathrooms, kitchens, office and commercial spaces, and others. These include wall linings, internal partition walls, built-ins, floor coverings, ceilings, tiles, internal glazings, pipework etc.

We hold an Unrestricted Demolition License, and as such are very capable in executing detailed partial strip outs and/or complete ‘back to base’ strip out of a building. In some cases when asbestos contaminated materials are discovered within walls and under floors, Beasy also holds a Friable Asbestos Removal License (ASA) to safely remove and dispose of hazardous materials such as asbestos.

Examples

Some exemplar past projects where we have conducted strip out works: