Services provided:
Cost
$1.2MLocation
Clyde NSWClient
John HollandNumerous times Beasy was engaged by John Holland to undertake demolition, asbestos removal and supervision at the Clyde train maintenance facility.
The scope of works involved of the following:
- pile cap trimming works
- sheds demolition
- concrete and rubbish stockpiled waste removal
- chimney demolitions
- demolition of gantry crane structure including concrete slab, and machinery plinths,
- demolition of 2000L underground liquid storage tank
- demolition of weigh bridge
- 6900m3 bulk excavations of general solid waste
- retention tank excavation
- soil relocation and compaction works
- sieving of stockpiles
- friable asbestos contaminated soils removal
- Atlantic Cell AC pipe and soil removal
- asbestos specialist worker sparrow picking works
Throughout the duration of the project, Beasy worked along operational train lines.