Services provided:

Cost

$115K

Location

Blacktown NSW

Client

Paynter Dixon

Beasy was engaged by the client to undertake structural demolition works and strip outs within Blacktown Workers Club which was undertaken in two stages. The demolition scope involved the demolition of a concrete stairway, various suspended concrete slab penetrations, and demolition of coolroom walls by mechanical means. We also undertook another suspended slab penetration for a proposed escalator and the stripping out of the gambling areas.

While the demolition works were being conducted, the centre remained operational so we took careful measures to ensure that disturbance to patrons was fully minimized.