Kimberley Clark Australia – 7 Williamson Street, Ingleburn

Beasy were engaged by Kimberley-Clark Australia to act as Principal contractor to salvage large manufacturing equipment before shrink wrapping and exporting to Malaysia, India, Singapore, South Korea and the US.

Beercroft Presbyterian Church

Removal of non-friable asbestos corrugated roof sheeting

Ku-ring-gai Council Depot and SES facility

Asbestos Removal & Demolition of Ku-ring-gai Council Depot & SES facility

Quakers Hill Nursing Home

Complete structural demolition and asbestos removal of Quakers Hill Nursing Home

Marrickville Hospital

Friable & Non-Friable asbestos removal, hertiage stripout, structural demolition, mulch installation and bitumen laying upon completion.

Aurora, Wetherill Park

Urgent demolition of 10t precast panels from an operational facility which was completed over the long weekend due to a tight time frame. Works involved preparation works, calculations, dust extractions, wet vacuuming etc.

Channel 9 Studios

Complete back to base strip out.

Blacktown Workers Club

Initially strip out works which moved into structural demolition including suspended concrete floor penetrations and large concrete stairs demolition.

Australian Museum

Demolition of concrete mezzanine levels and associated strip out works prior. Works were based within a heritage building.

Price Waterhouse Coopers

Full back to base strip out works including floor penetrations.

Commonwealth Bank of Australia, 120 Pitt Street, Sydney

Complete back to base strip out of 10 levels within a heritage listed building. Bank and Commsec remained operational throughout the duration of works.

Reserve Bank of Australia

3 level strip out including protection works of the heritage marble cladding in lift lobbies.