- Warehouse Demolition
- Terraces Demolition
- Structural Demolition
- Strip Outs
- Soil Remediation
- Non-Friable
- make safe
- Lead Based Paint Removal
- House Demolition
- Friable
- Forensic Demolition
- fire damaged
- Factory Decommissioning
- Factory Decommissioning
- Facade Removal
- Demolition Around Heritage
- Demolition
- CBD Building Demolition
- Bulk Excavations
- Bridge Demolition
- Asbestos Removal
- ASA Supervision
Kimberley Clark Australia – 7 Williamson Street, Ingleburn
Beasy were engaged by Kimberley-Clark Australia to act as Principal contractor to salvage large manufacturing equipment before shrink wrapping and exporting to Malaysia, India, Singapore, South Korea and the US.
83 – 85 Percival Road, Smithfield
Emergency fire damaged make safe works and demolition of a burnt down factory
279 Richardson Road, Spring Farm
Non-friable (bonded) asbestos removal works including subsequent demolition of residential dwelling and associated structures.
Ku-ring-gai Council Depot and SES facility
Asbestos Removal & Demolition of Ku-ring-gai Council Depot & SES facility
Rosehill Zone Substation
Beasy were engaged by the client to demolish a concrete structure within immediate vicinity of a live open air substation supplying electricity to the Parramatta region
Quakers Hill Nursing Home
Complete structural demolition and asbestos removal of Quakers Hill Nursing Home
Wollongong Central Shopping Centre
Beasy were contracted by Hansen Yuncken for friable asbestos remediation, structural demolition and excavation works during the construction of the West Keira Shopping Center.
Marrickville Hospital
Friable & Non-Friable asbestos removal, hertiage stripout, structural demolition, mulch installation and bitumen laying upon completion.
Aurora, Wetherill Park
Urgent demolition of 10t precast panels from an operational facility which was completed over the long weekend due to a tight time frame. Works involved preparation works, calculations, dust extractions, wet vacuuming etc.
South Sydney Leagues Club
Demolition of part of a structural frame using a mobile crane situated on a suspended slab.
CSIRO, North Ryde
Demolition of 13 Fire-Testing Facilities, asbestos removal works, and site remediation.
Hilton Hotel
Demolition of large structural concrete beams, slabs, and floors, including associated strip out and façade removal.
Crocodile Farm Hotel
Demolition of an internet cafe including brick walls and part demolition of a facility whilst remaining operational.
Blacktown Workers Club
Initially strip out works which moved into structural demolition including suspended concrete floor penetrations and large concrete stairs demolition.
ANSTO Building 34A
Demolition and disposal of ANSTO Building 34A and associated auxillary structures, asbestos removal, and contaminated concrete disposal.
Australian Museum
Demolition of concrete mezzanine levels and associated strip out works prior. Works were based within a heritage building.
483 Kent Street, Sydney (Kentbridge House)
Multi-level façade removal. Full encapsulation of roof for friable asbestos concrete façade removal.
Australian Fertilizers/Orica
Demolition of high level trusses and structural steel including associated asbestos removal works within the warehouse.