Location

83 - 85 Percival Road, Smithfield

Client

John Lyng Group

Beasy were engaged by John Lyng Group to conduct emergency fire damaged make safe works and demolition of a burnt down factory.

Beasy scope of works included the following:

  • Supply and installation of scaffolding
  • Mark safe of fire damaged asbestos contaminated debris through use of bonding agent spray
  • Demolish and remove the fire damaged metal debris
  • Demolition of partially upright fire damaged structures
  • Partial demolition of upright section of Block walls
  • Make Safe Removal of existing fire damaged debris
  • Removal of asbestos materials to be conducted with Friable Asbestos PPE as per Code of Practice “How to safely remove asbestos”
  • Separation of materials
  • Disposal of waste materials at an EPA approved waste facilities.