- Warehouse Demolition
- Terraces Demolition
- Structural Demolition
- Strip Outs
- Soil Remediation
- Non-Friable
- make safe
- Lead Based Paint Removal
- House Demolition
- Friable
- Forensic Demolition
- fire damaged
- Factory Decommissioning
- Factory Decommissioning
- Facade Removal
- Demolition Around Heritage
- Demolition
- CBD Building Demolition
- Bulk Excavations
- Bridge Demolition
- Asbestos Removal
- ASA Supervision
40 Stuart St, Manly
Aboriginal Smoking Ceremony on Beasy Pty Ltd Demolition Site In recognition of returning a sacred aboriginal burial site to the community, the Metropolitan Local Aboriginal Land Council held a smoking ceremony following the successful demolition at 40 Stuart Street, Manly. Beasy Pty Ltd respectfully and meticulously demolished the multilevel harbourside structure under the watchful eyes […]
Kimberley Clark Australia – 7 Williamson Street, Ingleburn
Beasy were engaged by Kimberley-Clark Australia to act as Principal contractor to salvage large manufacturing equipment before shrink wrapping and exporting to Malaysia, India, Singapore, South Korea and the US.
83 – 85 Percival Road, Smithfield
Emergency fire damaged make safe works and demolition of a burnt down factory
279 Richardson Road, Spring Farm
Non-friable (bonded) asbestos removal works including subsequent demolition of residential dwelling and associated structures.
Strickland House – Vaucluse
Concrete removal & reinstatement of new turf for Strickland House heritage building
35 Sparks Street, Mascot
Beasy were engaged by Urban Growth NSW: Landcom to perform Non-friable asbestos removal from the residential dwelling along with it’s subsequent demotion.
Ku-ring-gai Council Depot and SES facility
Asbestos Removal & Demolition of Ku-ring-gai Council Depot & SES facility
Rosehill Zone Substation
Beasy were engaged by the client to demolish a concrete structure within immediate vicinity of a live open air substation supplying electricity to the Parramatta region
Quakers Hill Nursing Home
Complete structural demolition and asbestos removal of Quakers Hill Nursing Home
Wollongong Central Shopping Centre
Beasy were contracted by Hansen Yuncken for friable asbestos remediation, structural demolition and excavation works during the construction of the West Keira Shopping Center.
Marrickville Hospital
Friable & Non-Friable asbestos removal, hertiage stripout, structural demolition, mulch installation and bitumen laying upon completion.
Aurora, Wetherill Park
Urgent demolition of 10t precast panels from an operational facility which was completed over the long weekend due to a tight time frame. Works involved preparation works, calculations, dust extractions, wet vacuuming etc.
South Sydney Leagues Club
Demolition of part of a structural frame using a mobile crane situated on a suspended slab.
CSIRO, North Ryde
Demolition of 13 Fire-Testing Facilities, asbestos removal works, and site remediation.
Liverpool City Council
Fire-damaged administration building. Demolition of roof, and concrete floors and walls.
APC Socotherm, Kembla Grange
Fire-damaged industrial complex. Removal of unstable walls, columns, and roof.
Hilton Hotel
Demolition of large structural concrete beams, slabs, and floors, including associated strip out and façade removal.
Clyde Train Maintenance Facility
Various demolition works. Large civil bulk earthworks including soil remediation of asbestos contaminated soils.
Crocodile Farm Hotel
Demolition of an internet cafe including brick walls and part demolition of a facility whilst remaining operational.
Blacktown Workers Club
Initially strip out works which moved into structural demolition including suspended concrete floor penetrations and large concrete stairs demolition.
ANSTO Building 34A
Demolition and disposal of ANSTO Building 34A and associated auxillary structures, asbestos removal, and contaminated concrete disposal.
Australian Museum
Demolition of concrete mezzanine levels and associated strip out works prior. Works were based within a heritage building.
Rosebank, 17 Speed Street, Liverpool
Friable asbestos removal works and demolition of an addon in a heritage listed structure.
27 Third Avenue, Condell Park
Non-friable (bonded) asbestos wall and ceiling sheeting removal including the demolition of the home.
34 Merino Crescent, Airds
Non-friable (bonded) asbestos removal works including subsequent demolition of structure.
483 Kent Street, Sydney (Kentbridge House)
Multi-level façade removal. Full encapsulation of roof for friable asbestos concrete façade removal.
Commonwealth Bank of Australia, 120 Pitt Street, Sydney
Complete back to base strip out of 10 levels within a heritage listed building. Bank and Commsec remained operational throughout the duration of works.
Reserve Bank of Australia
3 level strip out including protection works of the heritage marble cladding in lift lobbies.
Australian Fertilizers/Orica
Demolition of high level trusses and structural steel including associated asbestos removal works within the warehouse.
Colgate Palmolive
Structural demolition of tanks, silos, storage facilities, and other large structures via establishment of a 1500 Favco tower crane.