Kimberley Clark Australia – 7 Williamson Street, Ingleburn

Beasy were engaged by Kimberley-Clark Australia to act as Principal contractor to salvage large manufacturing equipment before shrink wrapping and …

Read more

83 – 85 Percival Road, Smithfield

Emergency fire damaged make safe works and demolition of a burnt down factory

Read more

Beercroft Presbyterian Church

Removal of non-friable asbestos corrugated roof sheeting

Read more

Eastwood Brick Pit Heritage Precinct

Partial demolition of heritage listed kilns

Read more

279 Richardson Road, Spring Farm

Non-friable (bonded) asbestos removal works including subsequent demolition of residential dwelling and associated structures.

Read more

Strickland House – Vaucluse

Concrete removal & reinstatement of new turf for Strickland House heritage building

Read more

35 Sparks Street, Mascot

Beasy were engaged by Urban Growth NSW: Landcom to perform Non-friable asbestos removal from the residential dwelling along with it’s …

Read more

Ku-ring-gai Council Depot and SES facility

Asbestos Removal & Demolition of Ku-ring-gai Council Depot & SES facility

Read more

Rosehill Zone Substation

Beasy were engaged by the client to demolish a concrete structure within immediate vicinity of a live open air substation …

Read more

Quakers Hill Nursing Home

Complete structural demolition and asbestos removal of Quakers Hill Nursing Home

Read more

Energy Zone Substations

Beasy has conducted various works with many substations throughout NSW.

Read more

Wollongong Central Shopping Centre

Beasy were contracted by Hansen Yuncken for friable asbestos remediation, structural demolition and excavation works during the construction of the …

Read more

University of Western Sydney – Female Orphan School

Beasy were engaged to perform the Friable Asbestos Removal and Lead Paint Removal from this heritage building.

Read more

Marrickville Hospital

Friable & Non-Friable asbestos removal, hertiage stripout, structural demolition, mulch installation and bitumen laying upon completion.

Read more

Sulzer Dowding & Mills

Removal of non-friable asbestos contaminated cement and galbestos roof sheeting including replacement and painting works.

Read more

Aurora, Wetherill Park

Urgent demolition of 10t precast panels from an operational facility which was completed over the long weekend due to a …

Read more

Pickles Auctions

Demolition of a warehouse shed including associated asbestos removal works

Read more

79 George Street, Parramatta

Demolition of a post-tensioned suspended concrete slab

Read more

Dowding and Mills, Rydalmere

Asbestos roof removal and plastic-lining of machines

Read more

South Sydney Leagues Club

Demolition of part of a structural frame using a mobile crane situated on a suspended slab.

Read more

Clyde – Auburn Railway

Beasy provided waste bins, ASA Friable supervision, and project management services for the removal works and disposal of contaminated asbestos …

Read more

CSIRO, North Ryde

Demolition of 13 Fire-Testing Facilities, asbestos removal works, and site remediation.

Read more

Ermington West Public School

Non-friable (bonded) asbestos ceiling soffit removal in a school during school holidays

Read more

Liverpool City Council

Fire-damaged administration building. Demolition of roof, and concrete floors and walls.

Read more

APC Socotherm, Kembla Grange

Fire-damaged industrial complex. Removal of unstable walls, columns, and roof.

Read more

Channel 9 Studios

Complete back to base strip out.

Read more

Strawberry Hills Hotel

Heritage external walls. Demolition of internal elements.

Read more

Blandville Court

Demolition of two concrete pedestrian bridges.

Read more

UNSW J18 Building

Demolition of steel beams, internal walls, and various external penetrations.

Read more

Eveleigh Rail Yards

Total demolition of train maintenance warehouse.

Read more

Beresford Hotel

Slab demolitions and bulk civil earthworks around heritage piers.

Read more

Hilton Hotel

Demolition of large structural concrete beams, slabs, and floors, including associated strip out and façade removal.

Read more

University of Sydney

ASA supervision during excavation of friable asbestos soils.

Read more

Clyde Train Maintenance Facility

Various demolition works. Large civil bulk earthworks including soil remediation of asbestos contaminated soils.

Read more

Sydney Opera House

ASA supervision during the excavation of friable asbestos soils whilst providing soil remediation works.

Read more

11 Fort Street, Petersham

Asbestos and lead dust removal in ceiling cavities. Bitumen works for the construction of a carpark and driveway.

Read more

4 Commercial Road, Kingsgrove

Full encapsulation works for friable asbestos dust removal on roof trusses.

Read more

Warilla North Public School

School-wide removal of friable asbestos contaminated materials along with full encapsulation works.

Read more

Crocodile Farm Hotel

Demolition of an internet cafe including brick walls and part demolition of a facility whilst remaining operational.

Read more

Blacktown Workers Club

Initially strip out works which moved into structural demolition including suspended concrete floor penetrations and large concrete stairs demolition.

Read more

ANSTO Building 34A

Demolition and disposal of ANSTO Building 34A and associated auxillary structures, asbestos removal, and contaminated concrete disposal.

Read more

RailCorp Maintenance Sheds

Demolition of maintenance sheds along operational railway lines.

Read more

FAI Workers Compensation Building

Full high rise building demolition in the CBD.

Read more

William Street Overpass Bridge

Demolition of an overpass bridge and associated ramps.

Read more

Australian Museum

Demolition of concrete mezzanine levels and associated strip out works prior. Works were based within a heritage building.

Read more

Rosebank, 17 Speed Street, Liverpool

Friable asbestos removal works and demolition of an addon in a heritage listed structure.

Read more

27 Third Avenue, Condell Park

Non-friable (bonded) asbestos wall and ceiling sheeting removal including the demolition of the home.

Read more

34 Merino Crescent, Airds

Non-friable (bonded) asbestos removal works including subsequent demolition of structure.

Read more

Penrith Supa Centa

Removal of large concrete façade panels.

Read more

495 Kent Street, Sydney

5-storey façade removal in busy Sydney CBD

Read more

483 Kent Street, Sydney (Kentbridge House)

Multi-level façade removal. Full encapsulation of roof for friable asbestos concrete façade removal.

Read more

DANA

High level demolition and factory decommissioning

Read more

St. Gobain Abrasives

Demolition of redundant factory machinery, plant and conveyors.

Read more

Price Waterhouse Coopers

Full back to base strip out works including floor penetrations.

Read more

Commonwealth Bank of Australia, 120 Pitt Street, Sydney

Complete back to base strip out of 10 levels within a heritage listed building. Bank and Commsec remained operational throughout …

Read more

Reserve Bank of Australia

3 level strip out including protection works of the heritage marble cladding in lift lobbies.

Read more

2101 Castlereagh Road, Penrith

Complete demolition of industrial sheds and administration blocks.

Read more

Australian Fertilizers/Orica

Demolition of high level trusses and structural steel including associated asbestos removal works within the warehouse.

Read more

11-15 Hill Street, Surry Hills

Demolition of three multi-level terraces.

Read more

Colgate Palmolive

Structural demolition of tanks, silos, storage facilities, and other large structures via establishment of a 1500 Favco tower crane.

Read more